Insulpak LogoInsulpak projects

Bauer Optimising Technologies - Free Trial

There are dollar and greenhouse gas savings and a better way of running your HVAC. 

Insulpak is so confident that we can provide minimum energy savings of at least 30% that we offer a free 90 day trial. You can have a no obligation test of the Bauer HVAC Optimising Technology in your premises or building and only pay to keep it if you are completely satisfied. *

Complete the form below to apply for your free trial.

Please note we will require additional information from your organisation if you wish to proceed with the trail. **

What you can typically expect from this three months free trial:

  1. 30% energy saving or better
  2. Possible 6-8 dbs reduction in noise
  3. Virtually no draughts
  4. Virtually even temperature throughout
  5. Reduced wear and tear on HVAC equipment
  6. Increased staff or tenant satisfaction
  7. Improved air quality
  8. A quoted upfront cost prior to start of work if you keep our system
  9. Reduced carbon emissions

Typically A fter 6 months:

  1. All of the above plus significantly reduced service calls

Typically After 12 months:

    • All of the above plus a reduced service maintenance costs of up to 30%
    • A yearly Bauer review and service report
    • Ongoing satisfaction and energy reduction commitment for when power / energy rates go up
    • Better AGBRS rating
    Free Trial Registration

    Organisation Company Name

    Trial Site or New Site Address

    City

    Country

    Authorised Decision-Maker Contact

    Position

    Phone

    Building Details
    i.e. Chiller Boiler & AHU's
    or Packaged Unit

    Type of Building
    Type of current DDC if any

    Size of Building in Cubic Meters

    min. volume 1,800 m3

    Condition of Current HVAC system

    Date Commissioned

    Reason for requesting trial.

    100% Satisfaction Guarantees

       read Insulpak's Privacy Policy

     

    * Bauer Optimising Technology requires a HVAC configuration which we will send you
       as part of the information pack.

    **Below is an indication of all the information we will require to go forward:

    • Floor Layout of the proposed project
    • Room Volume/s of the proposed project.
    • List of all AHU’s indicating to which plant room they belong and what area they serve.
    • What AHU belongs to which switchboard?
    • Equipment list (important that it shows motor data e.g. kW, voltage, etc.)
    • Reasonably air-tight building
    • Mechanical/electrical drawings including DDC drawings (.pdf if possible)
    • Mechanical drawings (duct layout etc.)
    • Fire mode operation description
    • Screen printout of AHU
    • Additional information may be required subject to the installation